Now that things are starting to happen pretty fast, I’m trying to stop by the house at least once a week to keep up with the construction progress. This tour of the inside framing is followed up by a video message I sent to my builder after discovering an error in the front entry where I had paid them $150 to eliminate the closet, (Remember my first meeting with Brian where he made me initial all changes? This was one of them.) It took weeks to get the closet removed, and that didn’t happen until they had already installed the outlets and light switches in the wrong place in the foyer. Just one of the frustrations of building from scratch with a large builder— Communication is not always the best. AND THEY DON’T LIKE CHANGES! — Even if planned from the beginning!